CMRL News
Chennai Metro Rail Limited to expand the network by 93 km to connect with the proposed Parandur airport with the extension of the Poonamallee-Sriperumbudur line.
Trial run of 9 km-long northern line of Chennai Metro will begin today
The line from Washermenpet to Wimco Nagar is an extension of phase-1 corridor from Washermenpet to Airport via Anna Salai
It has two underground and six elevated stations.
Loading...