Advertisement

East Coast railway News

alt
The Intrusion Detection System (IDS) will detect elephants approaching tracks and will send an alert to the station master, loco pilot, and station manager.
alt
While the cost of power in normal diesel LHB coaches is over Rs 36 per unit, in rakes with the HOG system, the cost comes down to Rs 6 per unit, said East Coast Railway.
alt
The cyclonic storm is likely to hit Odisha around December 4 morning. ECoR has cancelled trains till December 4.
alt
Since May 1, around 37 children have been born on board Shramik Special trains and on railway premises.
alt
The ECoR has converted 261 coaches to serve as quarantine or isolation facilities. The conversion has been done at different workshops and coaching depots of ECoR. These coaches have been kept at different stations across East Coast Railway. 
alt
In Odisha, the movement of trains was affected in the East Coast Railway (ECoR) in the wake of the strike at Talcher, Bhubaneswar, Brahmapur, Bhadrak and Kendujhargarh.
alt
It is to be noted that East Coast Railways have succeeded in resuming its services in less than 24 hours of the cyclone battering in the state
alt
A Tri-weekly Special train between Sambalpur and Shalimar via Angul and Bhadrak will also start.
alt
The train, comprising 147 wagons, three brake/guard vans and four engines, was planned between Godbhaga and Balangir railway stations in the Sambalpur Railway Division.
alt
Describing the incident as a minor one, railway officials said it took around two hours to make the affected track fit for resumption of train services.
alt
Railway Minister Suresh Prabhu on Thursday ordered a thorough probe into the accident.
alt
Passenger train (number 78408) hit the good train (BCN-DANKUNI) from behind in Odisha.






Loading...
english news
NEWS ON ONE CLICK