Train 18 interiors News
The semi-high speed train is scheduled to be flagged off by Prime Minister Narendra Modi on February 15.
The much-awaited indegenously built engineless Vande Bharat Express will run between New Delhi and Varanasi.
The semi-high speed train is scheduled to be flagged off by Prime Minister Narendra Modi on February 15.
Manufactured at Chennai`s Integral Coach Factory (ICF), the 16-coach train clocked 180 kmph during its trial run and was duly inspected by CCRS during its Safdarjung-Agra trial.
The train with a Swanky interior and world-class facility boasts a host of passenger friendly amenities.
The fully air-conditioned train will have 16 chair-car type coaches out of which two will be executive chair cars and 14 non-executive chair cars.
Earlier, Zee Media sources had said that Train 18 is likely to start operating by December 15.
T18 may have TEJAS train like fare structure.
Train 18 is capable of touching 200 kmph.
Train 18 would run at a speed of 160 kmph.
Train 18 will eventually replace Shatabdi Express trains on the Indian Railways network.
Train 18, a 100 perent 'Make in India' project will be manufactured at Integral Coach Factory in Chennai.
Loading...